NexusDB Newsgroups

NexusDB Newsgroups (http://www.nexusdb.com/forums/index.php)
-   nexusdb.public.support.qualitysuite (http://www.nexusdb.com/forums/forumdisplay.php?f=29)
-   -   Format of projects changed ? (http://www.nexusdb.com/forums/showthread.php?t=19441)

Sue King 25th September 2015 06:13 PM

Format of projects changed ?
 
Hello,

I've just installed 1.58. I had some projects created with 1.55.

When I open them in 1.58, the tracked routines are quite different from
what I was tracking in 1.55.

This is for both the Line timer and Method timer.

Has the format changed, or is there another way to restore the track
selections I had previously ?

Sue

Per Larsen 26th September 2015 10:05 AM

Re: Format of projects changed ?
 
Sue King wrote:

> Hello,
>
> I've just installed 1.58. I had some projects created with 1.55.
>
> When I open them in 1.58, the tracked routines are quite different
> from what I was tracking in 1.55.
>
> This is for both the Line timer and Method timer.
>
> Has the format changed, or is there another way to restore the track
> selections I had previously ?
>
> Sue


Sue,

The format did change to make project loading and saving much faster
for large projects, but the old one should still be (or have been)
supported for reading. If you email me the project file in question
(per@nexusdb.com) I'll take a look.

Thanks,

Per

Sue King 27th September 2015 09:44 AM

Re: Format of projects changed ?
 
Per Larsen wrote:

> Sue King wrote:
>
> > Hello,
> >
> > I've just installed 1.58. I had some projects created with 1.55.
> >
> > When I open them in 1.58, the tracked routines are quite different
> > from what I was tracking in 1.55.
> >
> > This is for both the Line timer and Method timer.
> >
> > Has the format changed, or is there another way to restore the track
> > selections I had previously ?
> >
> > Sue

>
> Sue,
>
> The format did change to make project loading and saving much faster
> for large projects, but the old one should still be (or have been)
> supported for reading. If you email me the project file in question
> (per@nexusdb.com) I'll take a look.
>
> Thanks,
>
> Per


The small number of routines being tracked (originally) means I can
easily readjust the project. If you are interested from a debugging
perspective, I'll send it. I thought it was worth raising the question
to know whether there was a change.

Thanks for the offer,

Sue

Per Larsen 30th September 2015 05:15 AM

Re: Format of projects changed ?
 
Sue King wrote:

> Per Larsen wrote:
>
> > Sue King wrote:
> >
> > > Hello,
> > >
> > > I've just installed 1.58. I had some projects created with 1.55.
> > >
> > > When I open them in 1.58, the tracked routines are quite different
> > > from what I was tracking in 1.55.
> > >
> > > This is for both the Line timer and Method timer.
> > >
> > > Has the format changed, or is there another way to restore the
> > > track selections I had previously ?
> > >
> > > Sue

> >
> > Sue,
> >
> > The format did change to make project loading and saving much faster
> > for large projects, but the old one should still be (or have been)
> > supported for reading. If you email me the project file in question
> > (per@nexusdb.com) I'll take a look.
> >
> > Thanks,
> >
> > Per

>
> The small number of routines being tracked (originally) means I can
> easily readjust the project. If you are interested from a debugging
> perspective, I'll send it. I thought it was worth raising the question
> to know whether there was a change.
>
> Thanks for the offer,
>
> Sue


I may come back to you if I get other, similar reports.

Thx,

Per


All times are GMT +11. The time now is 07:02 PM.

Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.